Search

This brand new MUGA facility for a primary school in Middlesborough is fully enclosed with fencing, and suitable for a range of sports. Our RevoSport shock pad was included to ensure maximum longevity of the synthetic turf surface and facility base. Roof netting was installed to ensure wayward shots didn’t escape into neighbouring gardens.

Specification

  • Customer: Synthetic Turf Management
  • Size: 485sqm
  • Related Product: RevoSport 10

Posted 15th July 2021

Back to Case Studies